Use this page to estimate your project timeline

We update this page regularly, but if you don’t find what you need, call us at  (781) 926-1234

Painting (interior)

The time it takes to paint a room depends on several factors, including the size of the room, the number of coats needed, surface preparation, and drying time. Here’s a general breakdown for an experienced painter:

  • Small Room (10x10 ft): 4-6 hours
  • Medium Room (12x12 ft): 6-8 hours
  • Large Room (16x16 ft or more): 8-10+ hours

Time Breakdown

Preparation (1-2 hours) – Taping, patching, sanding, and priming if needed.
Cutting In (1-2 hours) – Painting edges, corners, and trim before rolling.
Rolling Paint (1-3 hours per coat) – First coat and a second if needed.
Drying Time Between Coats (1-2 hours per coat) – Depends on paint type.
Cleanup (30 minutes - 1 hour) – Removing tape, and final touch-ups.

 

If multiple coats, ceiling painting, or accent walls are involved, the job may take longer. 

Bathroom Remodel

Typical Timeline

  • Cosmetic Remodel (New Paint, Fixtures, Vanity, No Major Changes)       1-2 weeks
  • Standard Remodel (Replacing Tub/Shower, Flooring, Tile Work, Minor Layout Changes)3-4 weeks
  • Full Remodel (Gutting, Moving Plumbing/Electrical, Custom Work)          4-8+ weeks

Time Breakdown

Demolition: 1-3 days
Plumbing & Electrical Work: 2-5 days
Framing & Drywall: 2-4 days
Tiling & Flooring: 3-7 days
Painting & Finishing Touches: 2-5 days
Fixture & Vanity Installation: 1-3 days

 

Unexpected delays (permits, material availability, or unforeseen issues) can extend the timeline, so it’s always good to plan for buffer time. A well-organized contractor can complete most remodels in 4-6 weeks.

 

 

Happy to answer any questions:

Call (781) 926-1234

Kitchen Remodel

Typical Timeline Estimates

  • Cosmetic Refresh (New Paint, Fixtures, Backsplash, No Structural Changes): 1-3 weeks
  • Standard Remodel (New Cabinets, Countertops, Appliances, Flooring, Minor Layout Adjustments): 4-8 weeks
  • Full Remodel (Gutting, Moving Walls, Plumbing/Electrical Changes, Custom Work): 8-12+ weeks

Time Breakdown

Planning & Design: 2-6 weeks (overlapping with ordering materials)
Demolition: 2-4 days
Structural Work (if needed): 1-2 weeks
Plumbing & Electrical Updates: 1-2 weeks
Drywall & Painting: 1 week
Flooring Installation: 2-5 days
Cabinet Installation: 1-2 weeks
Countertop Measuring & Installation: 1-2 weeks (templating happens after cabinets are installed)
Backsplash & Finishing Touches: 1 week
Appliance Installation & Final Details: 1-2 weeks

 

Potential Delays

  • Permits & Inspections (may add 1-3 weeks)
  • Material Lead Times (custom cabinets, countertops, appliances may take 4-12 weeks to arrive)
  • Unforeseen Issues (plumbing/electrical problems, structural surprises)

Total Time Estimate:

  • Small Refresh: 1-3 weeks
  • Standard Remodel: 6-8 weeks
  • Major Renovation: 10-12+ weeks

Proper planning, ordering materials in advance, can help keep the project on schedule!

Drywall

The time required to drywall a space depends on room size, complexity, and crew size. Here’s a general estimate for a standard 12x12 ft room with an experienced crew:

  • Solo Worker: 4-7 days
  • Small Crew (2-3 Pros): 2-4 days

Time Breakdown

Framing (if needed): 1-2 days
Hanging Drywall: 4-8 hours
Taping & Mudding (Multiple Coats with Drying Time): 2-3 days
Sanding & Finishing: 4-8 hours
Priming & Painting (if included): 1-2 days

 

Larger spaces, complex layouts, or specialty finishes (e.g., textured walls) may add extra time.

Basement Remodel

Typical Timeline Estimates

🔹 Basic Remodel (Paint, Flooring, Minor Updates): 2-4 weeks
🔹 Standard Remodel (Drywall, Flooring, Lighting, Bathroom Additions):                      4-8 weeks
🔹 Full Remodel (Framing, Electrical, Plumbing, Custom Features):                                    8-12+ weeks

 

Time Breakdown

Planning & Permits: 1-4 weeks (overlapping with ordering materials)
Demolition & Framing: 1-2 weeks
Electrical, Plumbing, HVAC: 2-4 weeks
Insulation & Drywall: 1-2 weeks
Flooring & Painting: 1-2 weeks
Cabinetry, Fixtures & Finishing Touches: 1-3 weeks

 

Potential Delays

  • Permit Approvals & Inspections (may add 1-3 weeks)
  • Material Availability (custom materials may take 4-8 weeks to arrive)
  • Unexpected Issues (moisture problems, foundation repairs, etc.)

Total Time Estimate:

  • Minor Updates: 2-4 weeks
  • Standard Remodel: 6-8 weeks
  • Major Renovation: 10-12+ weeks

Proper planning, ordering materials in advance, and hiring experienced contractors can help keep the project on schedule!

 

Happy to answer any questions:

Call (781) 926-1234

 

Outdoor Deck or Patio

General Timeline Estimates

  • Small Deck/Patio (10x10 ft, Simple Design): 1-2 weeks
  • Medium Deck/Patio (12x16 ft, Some Custom Features): 2-4 weeks
  • Large or Complex Deck/Patio (Multi-Level, Custom Features, Outdoor
  • Kitchen, Pergola, etc.): 4-8+ weeks

Time Breakdown

Planning, Design & Permits: 1-4 weeks (permits may add delays)
Site Preparation & Foundation (Grading, Footings, Concrete Work): 1-2 weeks
Framing & Structural Work: 1-2 weeks
Decking/Patio Surface Installation: 1-2 weeks
Railings, Steps, & Finishing Touches: 1-2 weeks
Additional Features (Lighting, Seating, Pergola, Outdoor Kitchen, etc.) :                1-3 weeks

 

Factors That Can Affect Timeline

  • Permits & Inspections (some areas require multiple approvals)
  • Material Availability (custom  materials may take longer to arrive)
  • Weather Conditions (rain or extreme cold can delay work)
  • Contractor Availability (busy seasons may extend project time)

Total Time Estimate:

  • Simple Deck/Patio: 1-2 weeks
  • Moderate Project: 3-4 weeks
  • Complex Build: 4-8+ weeks

Touch Up

The time it takes to touch up a room depends on factors like the size of the room, the number of touch-up areas, paint type, and drying time. However, here’s a general estimate:

  • Minor Touch-Ups (Small Marks, Nail Holes, Scuffs): 30 minutes to 1 hour
  • Moderate Touch-Ups (Multiple Spots, Some Edge Work): 1 to 2 hours
  • Extensive Touch-Ups (Blending Large Patches, Matching Sheen/Texture): 2 to 4 hours

If the touch-ups require primer, multiple coats, or extensive blending, the process could take longer due to drying time. 

 

 

Happy to answer any questions:

Call (781) 926-1234

Kitchen Cabinet Paint/Refinish

Repainting cabinets with wood stain to a lighter color is a multi-step process that typically takes 3-7 days, depending on drying times, and level of prep work required.

 

Time Breakdown:

Removing Cabinet Doors & Hardware: 1-2 hours
Sanding the Existing Stain: 1-2 days (longer if using chemical stripper)
Applying Wood Conditioner (if needed): 1-2 hours (plus drying time)
Applying Lighter Stain (1-2 Coats): 1-2 days (includes drying time)
Sealing with Clear Finish: 1-2 days (includes drying and curing time)
Reattaching Doors & Hardware: 2-4 hours

 

Total Estimated Time:

  • Basic Refinishing (Minimal Prep, 1 Coat of Stain): 3-4 days
  • Full Refinishing (Stripping, Sanding, Multiple Coats, Sealant): 5-7 days

 Allow proper drying time between coats.